Process & timeline

How long does it take to build a website?

A website can take anywhere from a weekend (a DIY builder) to three months or more (a traditional agency) — the timeline depends almost entirely on how much back-and-forth is built into the process, not on how good the final site is.

Why agency timelines stretch out

A typical agency engagement involves multiple discovery meetings, a design-review round, a development phase, a QA phase, and revisions at each stage — each with its own scheduling gap while people wait for feedback or availability. None of that time is spent actually building; it's spent waiting between steps.

That's not incompetence — it's how a large team with many clients has to operate. But it means a 6-week project often has less than a week of actual production time inside it.

What actually compresses a timeline

Three things make a fast build possible:

  • Locking the direction in one conversation instead of multiple review rounds
  • A production process where AI handles repetitive setup work, freeing experienced people to focus only on judgment calls
  • A single point of contact instead of a project being handed between departments

How a 72-hour build actually works

Launch72's process: a free 30-minute intake call to lock the direction and gather what you have (logo, photos, service list — or nothing at all, we'll write the copy and source images), then design and build, then one day for you to review and request a single round of changes. The clock starts at the intake call and the site is live within 72 hours.

If we're waiting on something from you — final approval, a missing detail — that wait time doesn't count against the 72 hours. Once we have what we need, we move fast.

FAQ

Related questions

How does the whole process work?

Book a free 30-min call → we lock the direction and scope on that call → we design and build → you get one day to approve or request a round of changes → you go live, in 72 hours.

When does the 72-hour clock start?

At your intake call. We deliver within 72 hours of that call.